Cast Iron Removal
When we first started work on this complete bathroom remodel, the original elements of the bathroom were still being used- including the old cast-iron tub. The walls and floor were covered with both cement and ceramic tile. After talking with the customer, the only options to replace the old piping, which was encased in cement was to break up the floor and walls. The customers decided to replace the tub with a new, white tub and tile surround. Ceramic tile was installed on the floor. The window was replaced along with the addition of wooden wainscoting to bring and a custom green tile stripe to add additional character to this beautiful bathroom.